2 Vessel Brewhouse

2 Vessel Brewhouse

Brewery System: 1000L brew system 5000L brew system Brewery System Processing: Our stainless plate import from Korea or China famous brand, also the surface treating could reach 2B standard. Polishing accuracy could reach 0.4um, while the welding is the fish scale welding with beautiful pattern....
Chat Now

Product Details

System

Components

Specification

Milling System

Miller

Double Roller:700rpm, 600rpm
Drive Power: 0.55kw
Output: 50kg/hr

Brewhouse System

Mash/Lauter tun

Grain mashing, Lautering

Brew Kettle/Whirlpool Tank

Wort boiling and whirlpool

Hot Water Tank

Hot water supply

Heat exchanger

One stage and two stage

Fermentation System

Fermentation Tank

Top manway/Side manway
Drying hop port to brew IPA
GlycolDimple jacket
Carbonation port to fill CO2

Yeast Adding Tank(option)

SUS304 Stainless Steel

Cooling System

Glycol tank

Equipped with PU level indicator

Glycol Chiller

Glycol water chilling (2HP)
Power supply: 3*220V/60Hz

Cleaning System

Cleaning,sanitizing and sterilization of vessels and pipes in the brewery

Control System

Control Cabinet

Manual/Semi-automatic/Automatic

All components &parameters can be customized according your requests.


Brewery System:

Output/Brew

200L

300L

500L

600L

800L

1000L

Brew / Week

2~6

2~6

2~6

2~6

2~6

2~6

Output / Week

400~1200L

600~1800L

1000~3000L

1200~3600L

1600~4800L

2000~6000L

Electric Supply

3phase/380(220, 415,440…)v/50 (60)Hz
     Single Phase/ 220(110, 240…)v/50(60)Hz

Heating Source

Electric/Steam

Area Request

>25M2

>30M2

>45M2

>50M2

>60M2

>70M2

Brew master

1

1

1

1

1

1


1000L brew system

image001


5000L brew system

image003


Brewery System Processing:

Our stainless plate import from Korea or China famous brand, also the surface treating could reach 2B standard.

image005(001)

Polishing accuracy could reach 0.4um, while the welding is the fish scale welding with beautiful pattern.

image007(001)


After sale service

1. Free consultation service before, during, and after sales;Layout plan in 3D or CAD drawings of your brewery;

2. Professional engineers going abroad for the installation,debugging,and training,all the travelling cost and locate food and hotel shall be afforded by the buyer

3. The installation period is about 15 days including assembling brewing tanks and training the operater. It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended installation.

4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer.

5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc should be installed separately.

6. If needed, cost calculate additionally.

7. Brewing technology,brewing formula,can be offered available

8. More spare parts are available to offered freely.


Inquiry