500L Brewing Equipment

500L Brewing Equipment

The beer equipment is mainly composed of a malt milling system, mash system, fermentation system, cooling system, control system, and CIP cleaning system.
Chat Now

Product Details

 mash system

Micro-beer production basically follows the pure beer method, that is only need malt, water, hops, and yeast.   The popular configuration is: mash tank, lauter tank, boiling /whirlpool tank. The mashing tank is used for malt impregnation and mash, the lauter tank is used for wort filtering and storage ,separation of hops, the boiling/whirlpool tank is used for boiling and separating the hot coagulum.

brewhouse

Fermentation equipment system

The fermentation mainly uses a conical fermenter and a horizontal fermenter. usually we use conical fermenter to fermentation.

500l fermentation

Auxiliary equipment

Water treatment system; malt miller  ; boiler: plate heat exchange; ice water tank and chiller; control system: CIP system.

冰水

Depending on the different of  beer’s demand, the model, the price, and the price is also different.

Product configuration list

Item

Name

Type

quantity

Milling system

Malt miller

300kg/h

1 PC

Mash system

Mash tank

500L

1PC

Lauter tank

500L

1PC

Boiling/whirlpool tank

500L

1PC

Steam generator

form a complete set 

1PC

Wort pump

3T/h 

1PC

Mash pipelines

form a complete set 

1PC

Plate heat exchanger

6m2

1PC

Yeast adding metering device

5L 

1PC

Fermentation system

Fermentation tank

500L

2pc/4pc/6pc

Cooling system

Brazed chiller

5P

2PC

Ice water tank

1000L

1PC

Ice pump


1PC

Cleaning system

Storage tank &Alkali tank

50L

1PC

Control System

control cabinet

Digital screen

1PC

our company

公司介绍

Payment & Service

1. Service & Guarantee

2. a.) Project planning and design services;

b.) Free debugging instruction of equipment until everything is functional;

c.) Management of equipment's long distance shipping from seller's factory to named port or station by buyer;

d.) Training of equipment maintenance and operating personally;

e.) For the whole beer system, the warranty is 3 years since completing of machinery’s commissioning work. All main machine guarantee is 5 years,main machine refers to all tanks. All of the accessories and facilities , are guaranteed for one year. The seller is responsible for the nature damage of the machinery in the warranty period except for man-made damage.

2. Payment Terms

a.) 40% of the whole amount pay as down payment by T/T before production;

b.) The balance 60% paid before shipment after inspection by T/T.

3. Delivery Time

Within 40-55 working days after confirmation of the initial payment. Holiday will be automatically postponed to meet after the holidays. send the full set of drawings not more than 5 working days after confirmation of the initial payment. The production start only after my approval on the drawings.


Inquiry